Produce

This part of the work plan is dependent on both the brief and the scope of the programme.


After Note:

Production can be explained in isolation but is executed with Planning. I have updated the previous post “Plan” to reflect some of this.

 

 

This post is incomplete and needs so much more detail that the above line will have to do for now 😉 
~Conánn


Posted

in

by

Tags: